Work methods

intest

Here is a picutre of the very first full lenght steam test of the tubes. It took the span of two rooms to set up the rig. It worked just fine. With two kettles powering the input, there was a roughly 5 min. delay before steam started coming out the back end. Heat was lost along the lenght of the pipe and steam condensed into water. The piping felt hot to the touch all along the tubing.

Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.