Winter storage

Happy holidays!

It has been long since the last post. Unfortunately, not much has changed. Except for adding rudder hinges and painting the interior of the boat, installing the mast step and a few more little things. In general, the masterplan is to buy all the rigging hardware and finish trimming the sails in the coming months. Aiming at a 2015. summer launch.

Meanwhile, Rod Cahill from Australia sent me a small gallery of his Fafnir and allowed to post the pictures here. Thanks Rod! It is somewhat elongated, having three cabin windows on the sides. Enjoy the pictures:

The next post will be about unboxing hardware.

This entry was posted in Building blog. Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.