Joosep started on the bow chamber, in which we plan to store some rope and the bow anchor. On the picture, the pieces which separate the usable area from the foam filled buoyancy section.
← Nearing the 50 kg epoxy limit
Joosep started on the bow chamber, in which we plan to store some rope and the bow anchor. On the picture, the pieces which separate the usable area from the foam filled buoyancy section.