Monthly Archives: March 2012

Bending it

Our first all video post of bending a stringer, enjoy:

Posted in Building blog | Tagged , , , , | Leave a comment

Acceleration

Well, after we decided that we want to be done with the build.. lets say quite soon, things have upped pace and screws are being screwed in faster than ever before. Today we finished epoxying the bow transom. Nothing left … Continue reading

Posted in Building blog | Tagged , , | Leave a comment

Forward bulkhead progress

The bow structures are now ready to be epoxied to place. We’ve finished two of the knees, one between the two forwardmost bulkheads (pictured) and the other between the bow stem and the forward bulkhead (not pictured). We’ve also started … Continue reading

Posted in Building blog | Tagged , , | Leave a comment