APP-1

Aprils first pictureless post – today we added the third plank to the boat (!), laminated the rudder and continued on the aft shelves. Two planks a day is achievable, so in theory we need three to four days to finish planking. But, but before that we need to install windows, complete the aft shelving and test out the inside cabin steering system. Joosep ordered some Sikaflex for the windows, which are going to be made of 8 mm polycarbonate UV-proof glass, which we have bought already. Rudder hinges need to be made too. So – pictures next week!

This entry was posted in Building blog. Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.